v1
Materials
Materials

Consume Allocation

Issue allocated units from a project line. Does not return them to stock.

Claimed: consume the claim ledger row, drop on-hand and allocated together, then shrink the mirrored BOM row. Purchased: consume the purchase ledger row on this lot. Scrap stays on the shop-lot write-off.

post/api/v1/materials/inventory/consume-allocation

Request

  • Base URL: https://api.jeevyfabrication.com (the document declares no server; this is the origin it was published from)
  • URL: https://api.jeevyfabrication.com/api/v1/materials/inventory/consume-allocation
  • Auth: none declared

Request body

item_idinteger required
allocation_idinteger nullable
qtynumber required
reasonstring nullable

Response

Successful Response

object required

Changes

No recorded changes to this operation across all 1 revision of this API.