v1
Materials
Materials
Consume Allocation
Issue allocated units from a project line. Does not return them to stock.
Claimed: consume the claim ledger row, drop on-hand and allocated together, then shrink the mirrored BOM row. Purchased: consume the purchase ledger row on this lot. Scrap stays on the shop-lot write-off.
post/api/v1/materials/inventory/consume-allocation
Request
- Base URL: https://api.jeevyfabrication.com (the document declares no server; this is the origin it was published from)
- URL: https://api.jeevyfabrication.com/api/v1/materials/inventory/consume-allocation
- Auth: none declared
Request body
Response
Successful Response
object required
Changes
No recorded changes to this operation across all 1 revision of this API.