Query the SPP generator interconnection queue — Southwest Power Pool's public GI Summary report, the waiting line of generation projects that have REQUESTED to connect to the SPP grid (the ~14-state c
Full input schema: GET /v1/power/interconnection-queue-spp/schema
post/v1/power/interconnection-queue-spp/query
Request
- Base URL: https://api.exascale.build
- URL: https://api.exascale.build/v1/power/interconnection-queue-spp/query
- Auth: none declared
Response
cited aggregates with citations
Changes
No recorded changes to this operation across all 1 revision of this API.