Query PJM's cluster/cycle service-request grid — the cluster view of PJM's interconnection process: the TC1/TC2 transition cycles (re-processing the pre-Order-2023 serial backlog) and the reopened ste

GET mirror of the POST body for browsing-only agents (PD-061). Plain pairs (repeated keys → lists; group_by accepts commas; top_n/limit → int) or a fully-typed q=<URL-encoded JSON> parameter. Full input schema: GET /v1/power/interconnection-queue-pjm-cycle/schema

get/v1/power/interconnection-queue-pjm-cycle/query

Request

  • Base URL: https://api.exascale.build
  • URL: https://api.exascale.build/v1/power/interconnection-queue-pjm-cycle/query
  • Auth: none declared

Query parameters

qstring

URL-encoded JSON object — exactly the POST body

Response

cited aggregates with citations

Changes

No recorded changes to this operation across all 1 revision of this API.