Query the ERCOT generator interconnection queue — ERCOT's public GIS Report (EMIL PG7-200-ER), the waiting line of generation projects that have REQUESTED to connect to the ERCOT (Texas) grid. Return
Full input schema: GET /v1/power/interconnection-queue-ercot/schema
post/v1/power/interconnection-queue-ercot/query
Request
- Base URL: https://api.exascale.build
- URL: https://api.exascale.build/v1/power/interconnection-queue-ercot/query
- Auth: none declared
Response
cited aggregates with citations
Changes
No recorded changes to this operation across all 1 revision of this API.