Query the CAISO generator interconnection queue — California ISO's public Public Queue Report, the waiting line of projects that have REQUESTED to connect to the CAISO grid (California, plus the out-o

Full input schema: GET /v1/power/interconnection-queue-caiso/schema

post/v1/power/interconnection-queue-caiso/query

Request

  • Base URL: https://api.exascale.build
  • URL: https://api.exascale.build/v1/power/interconnection-queue-caiso/query
  • Auth: none declared

Response

cited aggregates with citations

Changes

No recorded changes to this operation across all 1 revision of this API.