Query the ISO-NE generator interconnection queue — ISO New England's public IRTT "public queue" report, the waiting line of projects that have REQUESTED to connect to the New England grid (CT, MA, ME,
GET mirror of the POST body for browsing-only agents (PD-061). Plain pairs (repeated keys → lists; group_by accepts commas; top_n/limit → int) or a fully-typed q=<URL-encoded JSON> parameter. Full input schema: GET /v1/power/interconnection-queue-isone/schema
get/v1/power/interconnection-queue-isone/query
Request
- Base URL: https://api.exascale.build
- URL: https://api.exascale.build/v1/power/interconnection-queue-isone/query
- Auth: none declared
Query parameters
qstring
URL-encoded JSON object — exactly the POST body
Response
cited aggregates with citations
Changes
No recorded changes to this operation across all 1 revision of this API.