Query the CAISO generator interconnection queue — California ISO's public Public Queue Report, the waiting line of projects that have REQUESTED to connect to the CAISO grid (California, plus the out-o
GET mirror of the POST body for browsing-only agents (PD-061). Plain pairs (repeated keys → lists; group_by accepts commas; top_n/limit → int) or a fully-typed q=<URL-encoded JSON> parameter. Full input schema: GET /v1/power/interconnection-queue-caiso/schema
get/v1/power/interconnection-queue-caiso/query
Request
- Base URL: https://api.exascale.build
- URL: https://api.exascale.build/v1/power/interconnection-queue-caiso/query
- Auth: none declared
Query parameters
qstring
URL-encoded JSON object — exactly the POST body
Response
cited aggregates with citations
Changes
No recorded changes to this operation across all 1 revision of this API.