Query the PJM New Services (interconnection) queue — the public waiting line of projects that have REQUESTED to connect to the PJM grid (the mid-Atlantic RTO incl
Full input schema: GET /v1/power/interconnection-queue-pjm/schema
post/v1/power/interconnection-queue-pjm/query
Request
- Base URL: https://api.exascale.build
- URL: https://api.exascale.build/v1/power/interconnection-queue-pjm/query
- Auth: none declared
Response
cited aggregates with citations
Changes
No recorded changes to this operation across all 1 revision of this API.