Edit an action
Changed onOnly the fields sent change. dueQuarter null clears the due quarter; leaving it out keeps it. A changed reductionPct is re-estimated on the stored base snapshot; a typed estimate is edited with estimateKgCo2e. The catalogue entry, base, scope and site are fixed once added (add a new action instead). 404 ACTION_NOT_FOUND; 400 VALIDATION_ERROR. Requires org.edit_dashboard.
patch/net-zero/actions/{id}
Request
- Base URLhttps://api.greentally.ai/v1
- AuthHTTP bearer
Path parameters
idstring uuid required
Request body
Response
The edited action
Changes
- info
added the required property
/to the response with the status
- info
- info
endpoint added
- info