ORSA
Solvency II
climate scenario
orderly transition
disorderly transition
liquidity plan
Directive 2025/2
EIOPA
zero network
zero-PII

ORSA Readiness Pack

Deterministic ORSA readiness arithmetic over caller-declared synthetic inputs, checked against the duties inserted into Solvency II by Directive (EU) 2025/2: the two long-term climate scenarios of Article 45a(2) and the liquidity risk management plan of Article 144a(2). Computes scenarios_missing as the declared required set minus the declared run set, liquidity_plan as DOCUMENTED or MISSING, and an overall READY or NOT_READY verdict. No undertaking, no scenario engine, no supervisor, no network, no clock.

Tool URL: https://ainumbers.co/tools/679-orsa-readiness-pack.html AP2/Policy Mandate export: yes

post/v1/tools/compute_orsa_readiness_pack

Request

  • Base URL: https://ainumbers.co
  • URL: https://ainumbers.co/v1/tools/compute_orsa_readiness_pack
  • Auth: none declared

Request body

liquidity_plan_documentedboolean required

true when the liquidity plan is documented

Response

Successful tool execution result

scenarios_missingunknown
liquidity_plan'DOCUMENTED' | 'MISSING' | 'null' nullable

Read of the declared liquidity-plan flag.

tracestring

Full set-difference and flag trace, or the fail-closed reasons naming each rejected input.

overall'READY' | 'NOT_READY' | 'null' nullable

READY only when nothing is missing and the plan is documented.

Changes

No recorded changes to this operation across all 1 revision of this API.