v1-internal

Reset Connector Route

Admin-only: dispatch a connector reset as an async operation.

Returns 202 with an operation_id; the actual reset (drop pgstream, re-snapshot Neon main, re-deploy CDC) routinely runs several minutes and would otherwise blow the ALB 60s idle timeout. The caller polls GET /v1/operations/{id} for stage transitions and the terminal outcome (ARD-741).

Branches and Neon project survive the reset by design — see reset_connector for the safety contract.

Args: force: When true, bypass the in-flight WAL/Kafka drain wait inside the pgstream teardown step (ARD-870). Operator accepts that any un-replicated data is abandoned.

post/v1/internal/connectors/{connector_id}/reset

Request

  • Base URL
    https://api.tryardent.com (the document declares no server; this is the origin it was published from)
  • URL
    https://api.tryardent.com/v1/internal/connectors/{connector_id}/reset
  • Auth
    none declared

Path parameters

connector_idstring required

Query parameters

forceboolean

Response

Successful Response

unknown required

Changes

No recorded changes to this operation across all 5 revisions of this API.