plans

getTask

Get a task by ID with full details, evidence, activity, and the checklist array (each item: id, text, due_date, completed_at, plus server-stamped attribution). Returns versionTimestamp; pass it to updateTask to modify. Includes percent_complete for progress tracking. Also returns the work hierarchy: parentItem (the item this one belongs to, such as its epic or story: { id, friendlyId, title, type, status, isTask }, or null), children (the items that belong to it, in status order then by id, at most 200: each with ownerId, ownerTeamId and percentComplete) and childProgress { total, done, closed } over every child (closed counts done, rejected and deferred). Set a parent with parentItemId on updateImprovement or updateTask.

post/tools/getTask

Request

  • Base URL: https://api.stablebaseline.io/functions/v1/cloud-serve/api/v1
  • URL: https://api.stablebaseline.io/functions/v1/cloud-serve/api/v1/tools/getTask
  • Auth: HTTP bearer

Request body

projectIdstring

Optional. Narrows a friendly-id lookup to one project. Only needed when a friendly id is ambiguous — TAS-/IMP-/PLN- ids are numbered per PROJECT, so the same id can exist in several. Ignored when the id is a UUID.

taskIdstring required

Accepts either the UUID or the friendly id (e.g. TAS-176); friendly ids are resolved within your organisation.

Response

Tool result (shape varies per tool — refer to the tool's docs for the exact return value).

object required

Changes

No recorded changes to this operation across all 1 revision of this API.