plans

createTaskDependency

Create an FS/SS/FF scheduling edge with lag/lead between two items in the same plan (rendered as a Gantt arrow). FS = Finish-to-Start, SS = Start-to-Start, FF = Finish-to-Finish. lagDays: positive = lag, negative = lead/overlap. Rejects self-loops, duplicate (pred+succ+type) edges, cross-plan edges, and cycles.

post/tools/createTaskDependency

Request

  • Base URL: https://api.stablebaseline.io/functions/v1/cloud-serve/api/v1
  • URL: https://api.stablebaseline.io/functions/v1/cloud-serve/api/v1/tools/createTaskDependency
  • Auth: HTTP bearer

Request body

predecessorIdstring required

ID of the upstream item (the driver).

successorIdstring required

ID of the downstream item (the dependent).

dependencyType'FS' | 'SS' | 'FF' required

FS = Finish-to-Start, SS = Start-to-Start, FF = Finish-to-Finish.

lagDaysinteger

Lag (positive) or lead (negative) in days. Default 0.

Response

Tool result (shape varies per tool — refer to the tool's docs for the exact return value).

object required

Changes

No recorded changes to this operation across all 1 revision of this API.