Access Certification

Extend review window

Extends the active review window for a campaign run by the specified number of days. Existing reviewer decisions are preserved — only the end date changes.

Only active runs can be extended. Returns 409 Conflict if the run is not active.

Required permission: accesscertification (Full Access)

post/access-certification/campaign-runs/{runId}/extend

Request

Path parameters

runIdstring required

Campaign run public identifier (hex-encoded BSON ObjectID stored as object_id).

Request body

extendByDaysinteger required

Extend active review window by N days

Response

Review window extended successfully

campaignIdstring required
runIdstring required
reviewWindowEndstring date-time required

Updated review window end after extension

Changes

No recorded changes to this operation across all 1 revision of this API.