Grid Operations
Comprehensive grid operator analysis (installations, feed-in, redispatch)
Deep-dive analysis of grid operator network including all connected installations, redispatch potential, feed-in patterns, and grid stress points. Essential for DSO/TSO network planning and investment prioritization.
Analysis Components:
-
Connected Installations (from MaStR registry):
- Total count by technology type (PV, wind, storage, biomass, CHP)
- Installed capacity breakdown (MW by voltage level: NS/MS/HS)
- Geographic distribution (identify concentration hotspots)
- Commissioning trends (year-over-year growth)
-
Redispatch Potential (Redispatch 2.0 eligible installations ≥100 kW):
- Eligible installations count and capacity
- By technology (wind=highest curtailment risk, solar=seasonal)
- By location (identify congestion-prone areas)
- Cost exposure estimation (€/MWh curtailment * at-risk capacity)
-
Feed-in Patterns (hourly/seasonal analysis):
- Peak feed-in times (solar: 11-14h, wind: variable)
- Simultaneity factors (critical for grid dimensioning)
- Voltage rise risk assessment (high PV density areas)
- Reverse power flow analysis (substation overload risk)
-
Capacity Distribution Map:
- Hotspot identification (streets/transformers with high concentration)
- Grid stress visualization (utilization >85% = investment priority)
- White spot analysis (areas with expansion potential)
- Transformer capacity vs. connected load
Use Cases:
- Network Planning: Identify investment needs (transformers, lines, substations)
- Risk Assessment: Redispatch cost exposure, voltage stability, overload risk
- Investment Prioritization: ROI-driven CAPEX allocation, NEST project justification
- Regulatory Compliance: Redispatch 2.0, §14a EnWG controllable devices
- Strategic Planning: Expansion areas, smart grid solutions, §11 EnWG grid optimization
Critical Success Factors:
- Update monthly (MaStR registry changes frequently)
- Focus on MS/NS boundary (highest stress points)
- Prioritize prosumer-dense areas (highest grid impact per km²)
- Combine with dynamic tariffs (§14a EnWG) for CAPEX reduction
post/api/grid-operations/operator-analysis
Request
- Base URL: https://api.cernion.de
- URL: https://api.cernion.de/api/grid-operations/operator-analysis
- Auth: none declared
Query parameters
tokenstring
Optional Cernion MCP token as URL query parameter. If provided, it overrides CERNION_TOKEN for this request. Prefer Authorization Bearer header in production to reduce token exposure in URLs/logs.
Request body
Example request
{
"gridOperator": "Stadtwerke München",
"gridOperatorId": "SNB935578300972",
"gridOperatorBdewCode": "9900992720003",
"date": "2026-02-01"
}Response
Successful response
object required