health

Schedule Risk Index

Compute composite Schedule Risk Index across five sub-metrics.

Accepts a schedule with optional baseline dates, actuals, and resource fields. Sub-metrics are activated automatically based on available data (sub_metrics="auto"). Returns composite score, per-sub-metric breakdown, top risk drivers, and actionable recommendations.

post/api/v1/health/schedule-risk-index

Request

  • Base URL: https://api.bellatorsi.com (the document declares no server; this is the origin it was published from)
  • URL: https://api.bellatorsi.com/api/v1/health/schedule-risk-index
  • Auth: none declared

Headers

x-api-keystring nullable
authorizationstring nullable
x-bellator-internal-dispatchstring nullable

Request body

status_datestring nullable

Project data date (ISO 8601, e.g. '2026-03-17'). When omitted, Progress Integrity Risk is skipped and Baseline Drift Risk runs in degraded mode. Float Risk and Logic Risk remain fully active.

Example request

{
  "tasks": [
    {
      "duration_days": 10,
      "id": "T1",
      "name": "Design Phase",
      "percent_complete": 0,
      "planned_finish": "2026-01-15",
      "planned_start": "2026-01-01",
      "predecessors": [],
      "resource": "Team A"
    }
  ]
}

Response

Successful Response

status'pass' | 'fail' | 'warning' | 'info' required

Top-level result status — always present in every response.

scorenumber nullable
grade'A' | 'B' | 'C' | 'D' | 'F'

Letter grade derived from a 0–100 score. Null on non-scoring endpoints.

summarystring nullable
breakdownobject nullable

Changes

No recorded changes to this operation across all 1 revision of this API.