Update Budget
Change the budget on one of the caller's organization's active policies.
Organization admin only. The named policy is retired and a replacement holding the new budget is created, so repeating the call refuses: the policy it addresses is by then out of force, and the replacement has an id of its own.
An increase must leave the organization's active budgets for the resource kind summing under its ceiling. A change that does not raise the budget is accepted whatever that sum is, which is what lets an organization whose ceiling was lowered beneath its allocations reduce its way back under it.
The replacement is charged for the window's history as it is created, which is how consumption already measured survives the change, and the response says what that charge wrote. A charge that cannot be computed refuses the call and leaves the addressed policy in force with the budget it had.
Path parameters
Request body
Response
Successful Response
Changes
Changed in 2 of the 57 revisions of this API.2
- ○
added the required property
to the response with the statusresponse-required-property-added
- ○
- ○
endpoint added
endpoint-added
- ○
Of the 57 revisions, 9 have no diff computed.