Calculate a verified Bihar domestic before/after solar base-tariff comparison
When billing_month is supplied, the verified Bihar FPPAS engine is applied independently to the before-solar and after-solar base calculations. If no approved executable FPPAS version is available, the response remains successful and explicitly falls back to the verified base-tariff comparison. The response evaluates the existing Bihar non-monetary subsidy-entitlement contract independently for before-solar and after-solar consumption. It does not calculate or deduct a monetary subsidy amount from the tariff result.
post/solar-savings
Request
- Base URL: https://powerexpertindia.com/v1
- URL: https://powerexpertindia.com/v1/solar-savings
- Auth: one of:
- API key in header X-API-Key
- HTTP bearer
Request body
Example request
{
"subcategory_code": "BR_DS_II",
"existing_monthly_units": 450,
"post_solar_import_units": 150,
"release_id": "BR-2026-27-VERIFIED-STRICT-BASE-V1",
"billing_month": "2026-05"
}Response
Verified solar savings baseline
Example response
{
"api_version": "PEI Verified Tariff API V1.2.0",
"request_id": "req_bdcd24619052713e",
"data": {
"coverage_status": "production_verified",
"subcategory_code": "BR_DS_II",
"category_label": "DS-II",
"input": {
"connected_load": "2",
"load_unit": "kW"
},
"before_solar": {
"energy_units": 450,
"result": {
"energy_charge_paise": 333900,
"energy_charge_paise_rupees": "3339.00",
"fixed_charge_paise": 16000,
"fixed_charge_paise_rupees": "160.00",
"demand_charge_paise_rupees": "0.00",
"excess_demand_charge_paise_rupees": "0.00",
"tod_adjustment_paise_rupees": "0.00",
"special_adjustment_paise_rupees": "0.00",
"base_total_paise": 349900,
"base_total_paise_rupees": "3499.00"
}
},
"after_solar": {
"energy_units": 450,
"result": {
"energy_charge_paise": 333900,
"energy_charge_paise_rupees": "3339.00",
"fixed_charge_paise": 16000,
"fixed_charge_paise_rupees": "160.00",
"demand_charge_paise_rupees": "0.00",
"excess_demand_charge_paise_rupees": "0.00",
"tod_adjustment_paise_rupees": "0.00",
"special_adjustment_paise_rupees": "0.00",
"base_total_paise": 349900,
"base_total_paise_rupees": "3499.00"
}
},
"savings": {
"monthly_base_tariff_saving_paise": 222600,
"monthly_base_tariff_saving_paise_rupees": "2226.00",
"annualized_base_tariff_saving_paise": 2671200,
"annualized_base_tariff_saving_paise_rupees": "26712.00",
"base_cost_reduction_basis_points": 6362,
"base_cost_reduction_percent": "63.62"
},
"evidence": {
"release_id": "BR-2026-27-VERIFIED-STRICT-BASE-V1",
"financial_year": "2026-27",
"effective_from": "2026-04-01",
"effective_on": "2026-04-01",
"calculation_version": "PEI Verified Solar Savings Baseline V1.0.0"
},
"proposal_evidence": {
"subcategory_code": "BR_DS_II",
"category_label": "DS-II",
"usage_baseline": {
"existing_monthly_units": 450,
"post_solar_import_units": 150,
"solar_offset_units": 300
},
"verified_base_tariff_comparison": {
"before_solar_base_total_paise": 349900,
"before_solar_base_total_rupees": "3499.00",
"after_solar_base_total_paise": 127300,
"after_solar_base_total_rupees": "1273.00",
"monthly_base_tariff_saving_paise": 222600,
"monthly_base_tariff_saving_rupees": "2226.00",
"annualized_base_tariff_saving_paise": 2671200,
"annualized_base_tariff_saving_rupees": "26712.00",
"base_cost_reduction_basis_points": 6362,
"base_cost_reduction_percent": "63.62"
},
"tariff_basis": {
"release_id": "BR-2026-27-VERIFIED-STRICT-BASE-V1",
"financial_year": "2026-27",
"effective_on": "2026-04-01"
}
}
},
"meta": {
"release_id": "BR-2026-27-VERIFIED-STRICT-BASE-V1",
"controller_version": "PEI Unified Multi-State Controller",
"wrapper_contract": "PEI Verified Solar Savings Baseline V1.0.0"
}
}Changes
No recorded changes to this operation across all 1 revision of this API.