Scheduler

Terminates a scheduler by provided scheduler ID

Changed on
get/scheduler/terminate/{schedulerId}

Request

Path parameters

schedulerIdinteger required

Response

Scheduler has been terminated

Changes

    • info

      added the non-success response with the status

    • info

      added the non-success response with the status