power
transmission
electricity
water
broadband
infrastructure
site-feasibility
pre-development
public-records
x402
category:infrastructure

Power, water and broadband evidence pack

HIFLD transmission lines, EIA power plants, county public-water-system context, and official FCC broadband map for one US address or point. Site evidence before a utility call. No grid capacity, substation, interconnection, service availability, timing, cost, or performance finding. npx @velinussage/locus-agent-skill add.

post/api/locus-power-water-evidence-pack

Request

  • Base URL: https://api.locus.report
  • URL: https://api.locus.report/api/locus-power-water-evidence-pack
  • Auth: one of:
    • API key in header PAYMENT-SIGNATURE
    • API key in header Authorization

Request body

OR

Response

Successful paid artifact, or a free pre-charge diagnostic when the request is outside current coverage.

OR

Changes

No recorded changes to this operation across all 1 revision of this API.