power
transmission
electricity
water
broadband
infrastructure
site-feasibility
pre-development
public-records
x402
category:infrastructure
Power, water and broadband evidence pack
HIFLD transmission lines, EIA power plants, county public-water-system context, and official FCC broadband map for one US address or point. Site evidence before a utility call. No grid capacity, substation, interconnection, service availability, timing, cost, or performance finding. npx @velinussage/locus-agent-skill add.
post/api/locus-power-water-evidence-pack
Request
- Base URL: https://api.locus.report
- URL: https://api.locus.report/api/locus-power-water-evidence-pack
- Auth: one of:
- API key in header PAYMENT-SIGNATURE
- API key in header Authorization
Request body
Response
Successful paid artifact, or a free pre-charge diagnostic when the request is outside current coverage.
Changes
No recorded changes to this operation across all 1 revision of this API.