Job Item To Make Operation

Reopens a complete or cancelled job operation, setting it back to Ready.

Changed on

Resets the operation's quantity made to zero (an outside-processing operation keeps what its purchase orders received), sets downstream Ready operations back to Pending, and moves the job to In Progress. When the item was complete, the finished goods this job received for it are taken back out of inventory. The revert is all or nothing: when later inventory activity on the received lots blocks it, every receipt stays. Receipts through outside-processing purchase orders always stay, and reopening one chain of a split operation keeps all of the item's receipts. Materials picked for the operation stay picked; completing it again does not pick them a second time. Reopening an operation that is already Ready changes nothing, so a request that may not have landed can be safely resent.

post/api/jobs/{jobId}/items-to-make/{itemToMakeId}/operations/{operationId}/reopen

Request

  • Base URL
    https://api.fulcrumpro.com
  • URL
    https://api.fulcrumpro.com/api/jobs/{jobId}/items-to-make/{itemToMakeId}/operations/{operationId}/reopen
  • Auth
    none declared

Path parameters

jobIdstring required

The ID of the job

itemToMakeIdstring required

The ID of the item to make

operationIdstring required

The ID of the operation

Response

Operation reopened, or already Ready

jobIdstring required

The ID of the job

itemToMakeIdstring required

The ID of the item to make

operationIdstring required

The ID of the reopened operation

operationStatusstring required

The operation's status after this action

quantityMadenumber double required

The operation's quantity made after this action: zero, or for an outside-processing operation the quantity its purchase orders have received

finishedGoodsRevertedQuantitynumber double required

The finished-goods quantity this reopen took back out of inventory. Zero when the item was not complete, when later inventory activity on the received lots blocked the revert, or when the operation is one chain of a split operation.

finishedGoodsKeptQuantitynumber double required

The finished-goods quantity from this job the reopen left in inventory: everything when later inventory activity on the received lots blocked the revert, otherwise what outside-processing purchase orders received. Zero when no revert ran.

Changes