loadpoints
Set smart charging cost limit
Changed onSet cost or emission limit for fast-charging with grid energy.
post/loadpoints/{id}/smartcostlimit/{cost}
Request
- Base URLhttps://demo.evcc.io/api
- URLhttps://demo.evcc.io/api/loadpoints/{id}/smartcostlimit/{cost}
- Authnone declared
Path parameters
idinteger required
Loadpoint index starting at 1.
Example:1
Loadpoint index starting at 1
costnumber required
Cost limit in configured currency (default EUR) or CO₂ limit in g/kWh
Response
Success - Number result
number required
Changes
- breaking
the response's body type changed from
objecttonumberfor status - warning
removed the optional property
from the response with the status
- breaking
- breaking
the response's body type changed from
numbertoobjectfor status - info
added the optional property
to the response with the status
- breaking