projects

Set Checklist Item

Changed on

Tick or untick one onboarding or close-out item; finishing a list moves the project to its next stage.

post/api/projects/{project_id}/checklist

Request

  • Base URL
    https://api.electricair.io (the document declares no server; this is the origin it was published from)
  • URL
    https://api.electricair.io/api/projects/{project_id}/checklist
  • Auth
    none declared

Path parameters

project_idinteger required

Request body

keystring required
checkedboolean required

Response

OK

idinteger required
deal_idinteger required
customer_namestring required
customer_phonestring required
addressstring required
localitystring required
statusstring required
status_labelstring required
phasestring required
hers_statusstring required
payment_statusstring required
contract_valuenumber nullable
sold_atstring date-time nullable
completed_atstring date-time nullable
days_in_statusinteger nullable
permit_statusstring nullable
permit_status_labelstring nullable
incentive_summarystring required
loan_summarystring required
warranty_registeredboolean required
pre_install_checklistinteger[] required
closeout_checklistinteger[] required
customer_emailstring required
installed_onstring date nullable
final_inspection_onstring date nullable
done_onstring date nullable
notesstring required
quote_idinteger nullable

Changes

    • info

      added the optional property to the response with the status

    • info

      added the optional property to the response with the status

    • info

      added the optional property to the response with the status

    • info

      endpoint added