Create Change Order
Changed onCreate a change order on a contract. effective_date is required. An addition requires item_id, quantity, and rate. A payload with no modifications or additions is saved as a draft. With an effective_date after today, the save keeps this change order as draft and applies nothing. With a date of today or earlier, the save validates and applies it.
- An omitted billing_frequency or billing_interval uses the item catalog before the monthly default.
Request
- Base URL: https://api.dualentry.com
- URL: https://api.dualentry.com/public/v2/contracts/{contract_id}/change-orders/
- Auth: none declared
Path parameters
Headers
Optional. A unique value (a UUID works well) identifying this operation. If the request is repeated with the same key, the original response is replayed instead of the operation running again, so a retry cannot create a duplicate record. Results are replayable for 48 hours. Reusing a key with a different request body returns 422.
Request body
Response
Created
Changes
- warning
the
//request property's min was set to1.00 - warning
the
//request property's min was set to1.00
- warning
- info
added the optional property
////to the response with the status - info
added the optional property
////to the response with the status - info
added the optional property
////to the response with the status - info
added the optional property
////to the response with the status
- info