Reference data

Get fee baseline

Changed on

Price-list defaults for a distributor + sazba + period: the VT and NT distribution fees, the regulated POZE and system-services fees, and whether the sazba has a low tariff at all. Prefills the distribution block of a calculator request.

get/api/v1/reference/fees

Request

  • Base URL
    https://api.partner.cubee.cz
  • URL
    https://api.partner.cubee.cz/api/v1/reference/fees
  • Auth
    none required

Query parameters

distributorstring

Distributor code — CEZ, PRE or EGD.

ratestring

Distribution rate code (e.g. D57d).

periodstring

Period to price against: "2024", "2025" or "12M" (rolling 12 months).

Response

OK

distributorFeeHighPerMWhnumber double nullable

High-tariff (VT) distribution fee, Kč/MWh. Null when the price list has no row for the year.

distributorFeeLowPerMWhnumber double

Low-tariff (NT) distribution fee, Kč/MWh. 0 when the sazba is single-tariff.

ntAvailableboolean

True when the sazba is two-tariff (a non-zero NT distribution fee exists in the price list).

renewableEnergyFeePerMWhnumber double nullable

Renewable-energy (POZE) regulated fee, Kč/MWh.

systemServicesFeePerMWhnumber double nullable

System-services regulated fee, Kč/MWh.

feeSourceYearinteger nullable

The price-list year the fees were resolved from, or null when no matching price list existed.

Example response

{
  "distributorFeeHighPerMWh": 712,
  "distributorFeeLowPerMWh": 201.25,
  "ntAvailable": true,
  "systemServicesFeePerMWh": 212,
  "feeSourceYear": 2025
}

Changes