One electric car, with how long it takes to charge

One car by its slug, with everything the list carries plus charging: how long 10% to 80% takes on a 50, 150 and 350 kW charger, worked out from this car's own charging curve and the same assumptions the trip planner makes, so a car's page and a plan through it never disagree.

Slugs are built from the brand, model and variant and do not change when the source rewrites a record.

Figures from Open EV Data (github.com/KilowattApp/open-ev-data), MIT licensed with attribution required: credit "Open EV Data" wherever you use them. ChargeAlong does not measure cars and states what that dataset says.

The list is built into this API rather than held in its database, so it changes only when the API is deployed and may be cached for a day.

get/v1/vehicles/{slug}

Request

  • Base URL: https://api.chargealong.io
  • URL: https://api.chargealong.io/v1/vehicles/{slug}
  • Auth: none required

Path parameters

slugstring required

The car, as the list gives it: tesla-model-3-standard-range-plus

Response

The car, its charging times and the source

generated_atstring date-time required

When this answer was generated, UTC. Answers are cached, so it can be up to an hour old.

Changes

No recorded changes to this operation across all 1 revision of this API.