Netzfahrplan / fNAV
Calculate fNAV economics: avoided CAPEX, annual fee, payback (Phase 5)
Deterministic fNAV economics assessment. Computes:
- avoidedCopperCapexEur: cost of conventional grid expansion avoided by fNAV
- annualFeeEur: recurring cost of the fNAV contract
- paybackYears: avoidedCapex / annualFee
- sensitivityFlags: qualitative flags for high uncertainty inputs
Option B: calls eog-calculator.capexEstimate for TOTEX-based CAPEX reference; if unavailable, uses parametric fallback (FN_ECONOMICS_PARTIAL).
Governance Option B: governanceStatus is always requires_governance_decision until legalStatus=approved AND contractStatus=signed.
post/api/finance-agent/fnav/economics
Request
- Base URL: https://api.cernion.de
- URL: https://api.cernion.de/api/finance-agent/fnav/economics
- Auth: none declared
Query parameters
tokenstring
Optional Cernion MCP token as URL query parameter. If provided, it overrides CERNION_TOKEN for this request. Prefer Authorization Bearer header in production to reduce token exposure in URLs/logs.
Request body
Example request
{
"fnavProfile": {
"requestedCapacity": 5000,
"firmCapacity": 3000,
"flexibleCapacity": 2000,
"curtailmentWindow": 4,
"signalPriorityPolicy": "Netzsignal Vorrang vor Vermarktungs- und Fahrplanoptimierung",
"controlEvidenceRef": "SCADA-ATTACHMENT-42 / Fernwirknachweis 2026-05",
"contractStatus": "negotiating",
"legalStatus": "pending"
},
"gridOperator": "STROMDAO Netze",
"annualFeeEur": 12000,
"ownerContact": "netzplanung@stromdao.de",
"avoidedCapexOverrideEur": 1500000
}Response
fNAV economics result
Changes
No recorded changes to this operation across all 2 revisions of this API.