ChangeOrders
Submit change order for approval
post/change-orders/{id}/submit
Request
- Base URL: https://app.buildworkpro.com/api/v1
- URL: https://app.buildworkpro.com/api/v1/change-orders/{id}/submit
- Auth: HTTP bearer
Path parameters
idinteger required
Headers
Idempotency-Keystring uuid
Idempotent retry key for mutating operations. The first request with a given key executes normally and BuildWorkPro caches the response. Replaying the same key with the same request body (method + path + JSON body, SHA-256 hashed) returns the cached response without re-executing the mutation. Replaying with a DIFFERENT body returns 409 idempotency_key_reused. The cache TTL is 24 hours; after expiry the key is treated as a new operation. Keys are tenant-scoped. Recommended: a fresh UUID v4 per logical operation.
Response
Submitted
Changes
No recorded changes to this operation across all 1 revision of this API.