Sync
Get latest sync status
Inspect the most recent sync run for the project, including overall status, the URLs that were processed, and the event log for the run.
Use this to:
- Detect when an automated POST /api/v2/projects/{slug}/sources/ followed by POST /api/v2/projects/{slug}/sync/ flow has finished (status transitions from running to success/error/warning).
- Surface failures with actionable context. events includes per-URL warnings and errors.
For lightweight polling, prefer GET /api/v2/projects/{slug}/ and read its last_sync summary instead. It returns the same status and timestamps without the full event log.
Returns 404 when the project has never been synced.
Required permission: sync_read
get/api/v2/projects/{slug}/sync/
Request
- Base URL: https://app.biel.ai
- URL: https://app.biel.ai/api/v2/projects/{slug}/sync/
- Auth: API key in header Authorization
Path parameters
slugstring required
Project slug identifier.
Response
Sync status retrieved successfully
Changes
No recorded changes to this operation across all 1 revision of this API.