taskDependencies

Creates task dependency.

Changed on

Creates task dependency. The dependency links the selected tasks. <Check title="Required Permissions" icon="key">To create a task dependency, the user needs to be the assignee of both tasks or have ProjectPlanning permissions in general or in the project the tasks are related to.</Check>

post/taskdependencies

Request

  • Base URL: https://api.awork.com/api/v1
  • URL: https://api.awork.com/api/v1/taskdependencies
  • Auth: HTTP bearer

Request body

predecessorIdstring uuid

The Id of the predecessor. A task can have multiple predecessors through multiple dependency relationships.

successorIdstring uuid

The Id of the successor. A task can have multiple successors through multiple dependency relationships.

Response

OK

predecessorIdstring uuid

The Id of the predecessor. A task can have multiple predecessors through multiple dependency relationships.

successorIdstring uuid

The Id of the successor. A task can have multiple successors through multiple dependency relationships.

idstring uuid

The id of the task dependency.

createdOnstring date-time

The date this task dependency was created.

createdBystring uuid

The id of the user who created this task dependency.

updatedOnstring date-time

The date this task dependenc was last modified.

updatedBystring uuid

The id of the user who last modified this task dependency.

Changes

    • warning

      deleted the header request parameter Authorization

    • info

      the endpoint scheme security oauth2 was added to the API

    • info

      api operation id PostTaskDependency removed and replaced with taskDependencies_PostTaskDependency