Projects
Screen an injection on a planning case
A DC screen of the MW a bus can inject (or withdraw) before a circuit reaches its rating, with every outage studied: the ISO's named contingencies when the project has its list, else single circuits. Studies the project's POI when bus is omitted. Nothing is saved.
post/api/v1/project-rooms/{id}/files/{fileId}/study
Request
- Base URL: https://askthegrid.com
- URL: https://askthegrid.com/api/v1/project-rooms/{id}/files/{fileId}/study
- Auth: HTTP bearer
Path parameters
idstring required
fileIdstring required
Request body
Response
Success
Changes
No recorded changes to this operation across all 1 revision of this API.