---
title: "Query the SPP generator interconnection queue — Southwest Power Pool's public GI Summary report, the waiting line of generation projects that have REQUESTED to connect to the SPP grid (the ~14-state c"
method: POST
path: "/v1/power/interconnection-queue-spp/query"
---

# Query the SPP generator interconnection queue — Southwest Power Pool's public GI Summary report, the waiting line of generation projects that have REQUESTED to connect to the SPP grid (the ~14-state c

`POST /v1/power/interconnection-queue-spp/query`

## Request

- Base URL: `https://api.exascale.build`
- URL: `https://api.exascale.build/v1/power/interconnection-queue-spp/query`
- Auth: none declared

Full input schema: GET /v1/power/interconnection-queue-spp/schema

## Response `200`

cited aggregates with citations

## Other responses

- `400`: structured error (invalid_parameter, invalid_filter, …)

---

[API](https://skmtc.dev/exascale/apis/exascale-build-rest-api.md) · [All operations](https://skmtc.dev/exascale/apis/exascale-build-rest-api/llms.txt) · [OpenAPI document](https://skmtc.dev/exascale/apis/exascale-build-rest-api/revisions/f47706905f93?raw)
