title: "Query the ERCOT generator interconnection queue — ERCOT's public GIS Report (EMIL PG7-200-ER), the waiting line of generation projects that have REQUESTED to connect to the ERCOT (Texas) grid. Return"
method: GET
path: "/v1/power/interconnection-queue-ercot/query"
---

# Query the ERCOT generator interconnection queue — ERCOT's public GIS Report (EMIL PG7-200-ER), the waiting line of generation projects that have REQUESTED to connect to the ERCOT (Texas) grid. Return

`GET /v1/power/interconnection-queue-ercot/query`

## Request

- Base URL: `https://api.exascale.build`
- URL: `https://api.exascale.build/v1/power/interconnection-queue-ercot/query`
- Auth: none declared

GET mirror of the POST body for browsing-only agents (PD-061). Plain pairs (repeated keys → lists; group_by accepts commas; top_n/limit → int) or a fully-typed q=<URL-encoded JSON> parameter. Full input schema: GET /v1/power/interconnection-queue-ercot/schema

## Query parameters

- `q` string

## Response `200`

cited aggregates with citations

## Other responses

- `400`: structured error (invalid_parameter, invalid_filter, …)

---