---
title: "Query the CAISO generator interconnection queue — California ISO's public Public Queue Report, the waiting line of projects that have REQUESTED to connect to the CAISO grid (California, plus the out-o"
method: GET
path: "/v1/power/interconnection-queue-caiso/query"
---

# Query the CAISO generator interconnection queue — California ISO's public Public Queue Report, the waiting line of projects that have REQUESTED to connect to the CAISO grid (California, plus the out-o

`GET /v1/power/interconnection-queue-caiso/query`

## Request

- Base URL: `https://api.exascale.build`
- URL: `https://api.exascale.build/v1/power/interconnection-queue-caiso/query`
- Auth: none declared

GET mirror of the POST body for browsing-only agents (PD-061). Plain pairs (repeated keys → lists; group_by accepts commas; top_n/limit → int) or a fully-typed q=<URL-encoded JSON> parameter. Full input schema: GET /v1/power/interconnection-queue-caiso/schema

## Query parameters

- `q` string

## Response `200`

cited aggregates with citations

## Other responses

- `400`: structured error (invalid_parameter, invalid_filter, …)

---

[API](https://skmtc.dev/exascale/apis/exascale-build-rest-api.md) · [All operations](https://skmtc.dev/exascale/apis/exascale-build-rest-api/llms.txt) · [OpenAPI document](https://skmtc.dev/exascale/apis/exascale-build-rest-api/revisions/f47706905f93?raw)
