---
title: "Generate PDF for a change order (async)"
method: POST
path: "/change-orders/{id}/pdf"
tags: ["ChangeOrders"]
---

# Generate PDF for a change order (async)

`POST /change-orders/{id}/pdf`

## Request

- Base URL: `https://app.buildworkpro.com/api/v1`
- URL: `https://app.buildworkpro.com/api/v1/change-orders/{id}/pdf`
- Auth: HTTP bearer

Enqueues an async PDF generation job. Poll /api/v1/jobs/{id} for status; GET /api/v1/jobs/{id}/download for the signed URL.

## Path parameters

- `id` integer, required

## Headers

- `Idempotency-Key` string, uuid

## Response `202`

Job enqueued

- object
  - `data` object, required
    - `job_id` string, required
    - `status_url` string, required
  - `meta` ResponseMeta, required
    - `request_id` string: Server-generated request identifier
    - `pagination` PaginationMeta
      - `cursor` string, nullable, required: Opaque cursor for the next page; null when no more results
      - `has_more` boolean, required: Whether more pages are available after this one
      - `count` integer, required: Items in this page

## Other responses

- `400`: Error
- `403`: Error

---

[API](https://skmtc.dev/buildworkpro/apis/buildworkpro-api.md) · [All operations](https://skmtc.dev/buildworkpro/apis/buildworkpro-api/llms.txt) · [OpenAPI document](https://skmtc.dev/buildworkpro/apis/buildworkpro-api/revisions/441cf40012f7?raw)
