# What-If Analysis (Placeholder)

`POST /api/v1/simulation/what-if`

## Request

- Base URL: `https://api.bellatorsi.com` (the document declares no server; this is the origin it was published from)
- URL: `https://api.bellatorsi.com/api/v1/simulation/what-if`
- Auth: none declared

What-if scenario analysis - not yet implemented

## Query parameters

- `scenario` string

## Headers

- `x-api-key` string, nullable
- `authorization` string, nullable
- `x-bellator-internal-dispatch` string, nullable

## Request body

- ScheduleRequest: Request model for schedule analysis. This is the base schedule payload used across all Tier 1 and Tier 2 APIs. Additional Tier 2-specific fields enable full DCMA 14-Point compliance.
  - `tasks` Task[], required: List of tasks in the schedule
    - `id` string, required: Unique task identifier
    - `duration_days` number: Task duration in days
    - `predecessors` union[]: List of predecessor task IDs or dependency links. Supports: 'T1', 'T1FS+5 d', 'T2SS-2 d', or DependencyLink objects
      - union
        - string
        - object
        - DependencyLink: Rich dependency link with relationship type and lag/lead. Supports parsing from various scheduling tool formats including: - MS Project: "10FS+5 d", "/path/file.mpp/10FS+5 d" - Primavera P6: Similar format with XER encoding - Server-based: "<ServerFile>10FS+5 d" - Simple: "10" (defaults to FS with zero lag) Examples: >>> DependencyLink(task_id="10", relationship_type="FS", lag_days=5.0) >>> DependencyLink.from_string("10FS+5 d") >>> DependencyLink.from_string("15SS-2 d")
          - `task_id` string, required: Predecessor task ID
          - `relationship_type` 'FS' | 'SS' | 'FF' | 'SF': Task relationship types per PMBOK 6.3.2.2. Attributes: FINISH_START: Predecessor finish → successor start (most common, ~90%) START_START: Predecessor start → successor start (~5%) FINISH_FINISH: Predecessor finish → successor finish (~4%) START_FINISH: Predecessor start → successor finish (rare, ~1%)
          - `lag_days` number: Lag (positive) or lead (negative) in days
          - `is_external` boolean: True if link to external project file
          - `external_path` string, nullable: Path to external file if is_external=True
    - `name` string, nullable: Task name
    - `resource` string, nullable: Resource assigned to task
    - `resources` string[]: List of resources assigned (for multi-resource tasks)
    - `percent_complete` number: Percent complete (0-100)
    - `physical_percent_complete` number, nullable: Physical percent complete (0-100). Manual EVM entry by scheduler (MSP PhysicalPercentComplete). Authoritative for BCWP calculations. Captured separately from percent_complete on MSP imports.
    - `planned_start` string, date, nullable: Planned start date (ISO 8601)
    - `planned_finish` string, date, nullable: Planned finish date (ISO 8601)
    - `actual_start` string, date, nullable: Actual start date (ISO 8601)
    - `actual_finish` string, date, nullable: Actual finish date (ISO 8601)
    - `baseline_start` string, date, nullable: Baseline start date (ISO 8601)
    - `baseline_finish` string, date, nullable: Baseline finish date (ISO 8601)
    - `constraint_type` string, nullable: Constraint type: ASAP, ALAP, SNET, SNLT, FNET, FNLT, MSO, MFO
    - `constraint_date` string, date, nullable: Constraint date if applicable (ISO 8601)
    - `task_type` string, nullable: Task type classification. Valid values: task (default), milestone, loe, summary, schedule_margin, planning_package, slpp, schedule_visibility. Drives DCMA check exclusions per PAM 200.1 § 3.2.
    - `wbs_code` string, nullable: WBS code (e.g., '1.2.3')
    - `organization_code` string, nullable: Org/dept identifier for anomaly categorization (Progress Audit)
    - `custom_field_map` object, nullable: All WBS/OBS-pattern custom fields discovered in this MS Project file, keyed by alias (e.g., 'CWBS', 'OBS'). Null for XER imports or when no matching aliases exist.
    - `forecast_start` string, date, nullable: Current forecast start date (ISO 8601)
    - `forecast_finish` string, date, nullable: Current forecast finish date (ISO 8601)
    - `total_float_days` number, nullable: Pre-computed total float in days. Auto-computed by CPM if absent.
    - `baseline_duration_days` number, nullable: Baseline duration in days. Auto-computed from baseline dates if absent.
    - `delay_category` string, nullable: Delay attribution category. Valid values: owner, contractor, design, procurement, weather, force_majeure.
    - `earned_value` number, nullable: Earned Value (BCWP) in cost units. Requires options.include_ev_validation.
    - `budgeted_cost` number, nullable: Budgeted Cost of Work Scheduled (BCWS) in cost units.
    - `approval_required` boolean, nullable: Whether this task requires explicit approval before it can start.
    - `approval_status` string, nullable: Approval workflow state. Valid values: not_required, pending, approved, rejected.
  - `start_task_ids` string[]: Task IDs that anchor the project start (DCMA Check #1). If empty, tasks with no predecessors are treated as start tasks.
  - `finish_task_ids` string[]: Task IDs that anchor the project finish (DCMA Check #1). If empty, tasks with no successors are treated as finish tasks.
  - `status_date` string, date, nullable: Data date / status date for progress validation (ISO 8601 YYYY-MM-DD)
  - `target_finish_date` string, date, nullable: Target project finish date or key milestone date for CPLI calculation (ISO 8601)
  - `baseline_approved_date` string, date, nullable: Date when baseline was approved (for governance tracking)
  - `resource_availability` AppModelsSchemasResourceAvailability1[]: Per-resource availability for over-allocation detection (Resource Analysis API).
    - `resource_name` string, required: Resource name (must match tasks[*].resources)
    - `available_from` string, date, nullable: Start of availability window (ISO 8601). Null = project start.
    - `available_to` string, date, nullable: End of availability window (ISO 8601). Null = project finish.
    - `units_per_day` number: Available resource-units per working day (default: 1.0 = 100%)
  - `options` ValidationOptions: Options for POST /api/v1/schedule/validate (v0.2.0).
    - `calculate_pop` boolean: Calculate Probability of Performance (PoP) score (v0.2.0).
    - `include_pop_details` boolean: Include dimensional PoP breakdown in response.
    - `strict_mode` boolean: Treat warnings as errors (fail validation on any issue).
    - `check_dcma_compliance` boolean: Include DCMA-specific checks (#1, #8).

## Response `200`

Successful Response

- unknown

## Other responses

- `422`: Validation Error

---